Quality Control

Our stabilisers and transformers have undergone a 100% thorough inspection.

Quality Control

       Factory Quality Control and Inspection

  • KESUN follows strict factory quality control procedures for our voltage stabilizers, distribution transformers, and three-phase transformers.
  • 100% Inspection: Every unit undergoes routine quality inspection before shipment.
  • Safety Testing: Visual, mechanical, insulation, dielectric strength, and earth continuity checks.
  • Performance Testing: No-load, half-load, and full-load tests, including overvoltage, undervoltage, overload, short-circuit, and over-temperature protection.
  • Final Quality Checks: Full-load ageing tests, noise and display checks, final inspection, documentation, and packaging.
  • Performance Standards: Voltage regulation accuracy up to ±1%, THD ≤3%, and full-load efficiency ≥95%.
  • Compliance: Products meet applicable IEC standards and relevant CE and RoHS requirements.
  •  

Send Your Inquiry Today

Our senior sales engineer Mark will reply to your email within 24 hours. 

Please note the email with “@kesunme.com”.